ETP
Effluent
treatment plant (ETP) is very much essential to process waste water. Here we
are giving a data on how to set up ETP for Garments Washing factory.
Process of ETP plant setting up
Please work the water
treatment on two quotes 1st on a 30-meter cube and 2nd on a 50-meter cube.
The peak flow will be for
three washing machines – the washing machines cycles will be as per below:(machine
Ref 2713- 30kgs have a maximum capacity of 146 lts) this will be one small
machine for washing the sample) and ref 2700-100kgs have a maximum water
capacity of 385 lts this will two machine for washing the production)
The type of washing process
please work on two quotes 1st Normal wash plus softener and 2nd Normal wash
plus softener and Enzyme wash.
The type of cloth/garment
being washed will be for Kids and Children wear and mostly 100% cotton
fabric.
The chemicals that you will
be using for the washing process will be Normal wash Acetic acid, Silicon,
Softener / Enzyme wash Anti back staining and softener. The PH will be 5 to 7
for children wear products.
The ultimate use/disposal
of the treated effluent- For irrigation purpose.
The norms and regulation
that need to be satisfied are for regulation of Environment.
The area/space for setting
up the treatment plan will depend on your study and plan that we will be needed
for the water treatment, please work the plan and tell us the space; we have
enough space for that purpose.